Go Back
Triple Co-extruder Line ( 65-120-90) Silane Cross-linking Extrusion Line
More Details
Triple Co-extruder Line ( 65-120-90) Silane Cross-linking Extrusion Line.
1. Application
XLPE 6-35 KV 3-layer Co extrusion CCV line for cable is suitable for copper or aluminum wire core, making 6-35 KV voltage XLPE insulated cables. Arranging piping adopt the semi-hanging chain type, using crosslinking heating method, nitrogen cross-linked, water-cooled three-way cross-linking method were extruded production line, cross-linked structure of cable products meet the relevant standards GB/T12706-2002 or IEC Standard.
2. Main technical parameter
- Voltage class
- XLPE 6-35 KV
- Conductor cross section
- Cu: 35-630 mm2
- Al: 50-800 mm2
- Max. Weight of cable
- 10 Kg/m
- Outer diameter of cable
- ≤Φ75 mm
- Wall thickness
- Φ65 extruder 0.5-2.0 mm
- for inner layer
- Φ150 extruder 2.5-10.5 mm
- for insulation layer
- Φ90 extruder 0.5-2.0 mm
- for outer layer
- Length of vulcanizing tube
- 155m
- Heating section length
- 54m, 6 m×9 sections
- Pre-cooling section length
- 12 m, 6 m×2 sections
- Water cooling length
- 84 m, 6 m×14sections
- Needed area of main platform (L×W)
- ≥24 m×18 m for one line
- ≥30*24m for two lines
- Height of 3-platform
- 13.5 m
- Needed length of workshop (premises)
- ≥180 m
- Nitrogen gas
- Pressure: 2.0-2.5 Mpa
- Purity: 99.5%
- Consumption:0.4-1.8 m3/h
- Volume of N2 tank: 5 m3
- Cooling water
- Pressure:0. 2-0.6MPa
- Consumption: 25 m3/h
- Compressed air
- Pressure: 0.6-0.8MPa
- Consumption: 0.8 m3/h
- Installed capacity
- 1000kVA (Power voltage: 380V, 50HZ)
- Two power incoming lines
- 3*185mm2, 3*240mm2
3. Main components of 35 CCV line
- Φ1600-Φ2500mm Walk pay-off rack
- Φ1600 horizontal accumulator
- 30KN upper caterpillar
- SJ65/20 conductor shield extruder
- SJ150/25 insulating layer extruder
- SJ90/20 insulated shield extruder
- Triple layer co-extrusion cross head
- Upper sealing device
- Cross-linked tube
- Suspension controller
- Lower sealing device
- Meter counter
- Lower caterpillar
- Φ3150mm Gantry walking type take-up and traverse line rack
- Nitrogen supply and discharge
- Oil and water circulating cooling system
- Electric control
- TV monitoring system
- Tooling accessories
4. Regular Business Terms
- Delivery time: Within 6 months after the advanced payment is received (contract takes effect)
- Payment method: 30% advanced payment, gradient payment, 65% pick up payment, and 5% after debugging
- Spare parts: according to the packing list
- Transportation method: EXW
- Equipment installation: The cost will be discussed separately (installation by the purchaser, technical guidance by the supplier, and adaptation by the purchaser)
- Equipment debugging: The supplier shall conduct free debugging, and the accommodation and means of the staff shall be borne by the demander
- After sales service: Equipment lifetime service, free warranty within one year after debugging, (excluding human factors), and charging services outside the warranty period
- Liability for break of contract: as agreed by both parties and handled in accordance with the Contract Law
- Production date: 180 days after receive deposit
- Price Valid Date: 30 days
- Warranty time: 12 months after installation
- Technical teaching service: all lives
- Equipment installation: The Demander shall be responsible for the installation itself or the Supplier shall be responsible for the contract, and the cost shall be discussed separately (in principle, the Demander shall install according to the requirements, the Supplier shall be responsible for the technical guidance, and the Demander shall bear the board and landing)
- Equipment commissioning: The Supplier shall conduct the commissioning free of charge, and the Demander shall bear the accommodation of the staff